|
April 2003 – registration of Rabels FurnitureWe started with an office and small production. The available instruments and machines are orientated to production of furniture from laminated chipboards. In spite of the limited colour availabilities of these materials at this time, we aimed the projects and the type of our products to be interesting and different. |
|
|
|
|
|
We realize complete interiors in private flats. We realize our projects including preparatory construction processes. Working with architectural studios in the realization of projects for hotels and shops.
|
|
2008 – buying painting chambersBy the glossed surfaces, treated in the chamber, we realize big surfaces of linings at “Fantastico” shops in Sofia.
|
|
2009 – the company obtains “Certificate for implemented Quality Assurance System in compliance with ISO 9001:2008” issued by the Certification International (UK) LimitedRealization of big sites on the territory of Sofia city, in which we apply the latest technologies and the best materials to achieve a high gloss degree of MDF chipboards.
|
|
2010-2013 – experiments with various technologies for wood processing, allowing to achieve diverse effects of furniture ageingWe visited the international exhibition for furniture “I SALONI”, Milano, Italy (www.cosmit.it). Inspired by the achievements of our colleagues in Italy, we placed ourselves the task to introduce new technology for finish processing of wooden surfaces. In September 2010 we are certified after visiting a training course to work with the products of “Sigmar vernici” company in San Giovnni al Natisone, Italy (www.sigmarvernici.com)
|
|
2014-2015 – After renovation of machine park, we have increased capacities to assume bigger sitesMachine park is innovated and supplemented completely. New CNC boring machine VITAP (www.vitap.it) is bought. New aspiration system is mounted. In this period we realized many big interior projects.
|
|
2016 – Bought boring-milling center with 4th axis C with CNC control BIESSE (www.biesse.com)Machine is equipped with independent aspiration system. Staff is trained to provide adequate utilization of capacity and possibilities of machine.
|